WAREHOUSING & SORTATION

Harris Scarfe sortation

Bulk packing and multilane sortation

Discuss a similar project ↗
Materials handling imagery from the RS Automation backup
Materials-handling portfolio image; not a verified photograph of this particular installation.
01

Historical project reference

The saved Materials Handling page describes bulk packing into a ten-lane sortation system for Harris Scarfe. It records a historical capacity of more than 8,000 cartons per day; this is a description of that installation, not a current performance guarantee.

  • Bulk-packing application
  • Ten-lane sortation
  • Carton tracking and sorting
02

Coordinating packing and destination selection

For a comparable project, establish the points at which products are detected, identified and transferred. Agree the information each machine needs and how the controls and tracking records should behave when an item is not detected, a downstream section is unavailable or a connection is interrupted. These are planning questions for a new enquiry rather than additional claims about the archived installation.

  • Product-identification and sensing points
  • Equipment handshakes and transfer conditions
  • Exception handling and controlled recovery
  • Operator indication and diagnostic information
03

Information for a similar project

Provide a simple material-flow diagram, the installed controller and scanning equipment, and the database or tracking interface involved. Describe the required behaviour and the operating issue you want to address. Include your production window and which suppliers need to participate in commissioning.

  • Process flow and equipment list
  • Existing control and database interfaces
  • Available drawings and software backups
  • Testing, timing and handover expectations